Currently http is used to access git, however http is not safe enough
since the access information contains our account/password information.
Use https instead of http to ensure the safety.
And for others services such as pypi or python, it's still nice to use
https.
Change-Id: I706a4a1873c6bbc05385057757fc5962344f9371
Here is a new architecture diagram with some updates on the
glossary and on descriptions of architecture elements.
I also fix some warning logs.
Closes-Bug: #1657405
Change-Id: I442082d702fc8667e9397c090da51ca1ead5d86e
In this changeset, I added the support for both Monasca and
Ceilometer for the basic_consolidation strategy.
Partially Implements: blueprint monasca-support
Change-Id: Ide98550fbf4a29954e46650190a05be1b8800317
For multinode setup, a couple of updates to /etc/nova/nova.conf was
needed for live migration.
serial_console needed to be disabled and vncserver_listen needed to
be set to any for the vncserver to accept connections from all of the
compute nodes.
Change-Id: I62ebc2a07ca525bd80da130981f337806b2b89ae
Closes-Bug: #1649638
In this changeset, I added a new Sphinx directive (from Nova) that
allows us to automatically display notification samples for of
all the upcoming notifications in Watcher.
Partially Implements: blueprint watcher-notifications-ovo
Change-Id: Id7d819ee21db6dc616c78faea483b883f77e3bd6
In this changeset I added a Model abtract base class for models
and updated the plugin docs to reference it. I also added the
CDM and CDMC acronyms to the glossary.
Change-Id: Ie7d76a9f84d545715fa6e5bf350b9d2321bab9e1
This patch set adds rally-jobs folder with watcher.yaml scenario
to get rally support for Watcher project
Change-Id: Icb8eace045d86a9b78b543a8a49fe747f4b00772
This change is updating the glossary with Scoring Module terms
and adding an information page about implementing scoring engine
plugin.
Partially-Implements: blueprint scoring-module
Change-Id: I411370dcc003ed837d8ce67659ecbfef3548ee11
In this changeset, I updated the CDMC plugin documentation to explain
how to implement and register new notification endpoints.
Change-Id: Ib8c014e82051647edef5c1272f63429f76673227
Partially-Implements: blueprint cluster-model-objects-wrapper
In this changeset, I refactored the whole Watcher codebase to
adopt a naming convention about the various elements of the
Compute model so that it reflects the same naming convention
adopted by Nova.
Change-Id: I28adba5e1f27175f025330417b072686134d5f51
Partially-Implements: blueprint cluster-model-objects-wrapper
In this changeset, I merged the metrics_engine package into
the decision_engine one alongside the required changes to make
the tests pass.
Change-Id: Iac1cd266a854212bf4fa8b21c744b076c3b834a8
Partially-Implements: blueprint cluster-model-objects-wrapper
In this changeset, I updated the architecture documentation
about the Decision Engine by adding a new sequence diagram
outlining the CDM synchronization workflow.
I also explained the default 'period' parameter used in the
CDMC plugin.
Change-Id: I09790281ba9117e302ab8e66a887667929c6c261
Partially-Implements: blueprint cluster-model-objects-wrapper
In this changeset, I wrote down the documentation on how to implement
a cluster data model collector plugin for Watcher.
This documentation corresponds to part 1 of the associated
specification.
Change-Id: Iac72b933df95252163033cd559d13348075a9b16
Partially-Implements: blueprint cluster-model-objects-wrapper
Add docs of how to define and input parameters of strategy.
Change-Id: I918305b89721d141b7f37630459e6cf5999f4211
Partially-Implements: optimization-threshold
line 93:An ref:'action plugin <implement_strategy_plugin>
here implement_strategy_plugin should be 'implement_action_plugin'
Change-Id: I3487578b91bd169335ccf336443e6174905728b0
Closes-Bug: #1599029
In the base-setup.rst about 3rd-party plugins,
we should add the watcher dependency requirement.
Change-Id: I8f898b2e3e7e30c88f4f14f7bd3ae38b8aa3ebd3
Closes-Bug: #1594705
Currently we have to amend the code of the Planner
for each new added Watcher Action. This patch set will
modifying the DefaultPlanner class and leverage the
plugins-parameters blueprint so that we can configure
weights via the configuration file.
Documentation and unittest also be update in this patch.
Co-Authored-By: Vincent Françoise <vincent.francoise@b-com.com>
Change-Id: Ib794488fcafd1e153a7d7b1f7253686136501872
blueprint: configurable-weights-default-planner
In this changeset, I wrote a documentation detailing how one can
implement a new goal plugin. I also mention to define the efficacy
specification for a given goal.
Partially Implements: blueprint efficacy-indicator
Change-Id: Iba267ae312f248b49d4600504f11678cdc225622
In this changeset, I updated the documentation to explain how to
add configuration options for each type of plugin.
Partially Implements: plugins-parameters
Change-Id: Ifd373da64207110492b4a62f1cb7f13b029a45d2
In this changeset, I updated the Watcher documentation to reflect
the changes that are introduced by this blueprint.
Partially Implements: blueprint get-goal-from-strategy
Change-Id: I40be39624097365220bf7d94cbe177bbf5bbe0ed
In this patchset, I added a small subsection which highlights the fact
that actions are using Voluptuous Schemas to validate their input
parameters.
Change-Id: I96a6060cf167468e4a3f7c8d8cd78330a20572e3
Closes-Bug: #1545643
This documentation is a pre-requisite to all plugin documentation
as it guides you through the creation of a project from scratch
instead of simply forcusing on the implementation of the plugin
itself.
Change-Id: Id2e09b3667390ee6c4be42454c41f9d266fdfac2
Related-Bug: #1534639
Related-Bug: #1533739
Related-Bug: #1533740
As we modified the way a strategy gets implemented in
blueprint watcher-add-actions-via-conf, this patchset updates the
documentation regarding the implementation of a strategy plugin.
Change-Id: I517455bc34623feff704956ce30ed545a0e1014b
Closes-Bug: #1533740
This documentation describes step-by-step the process for implementing
a new planner in Watcher.
Change-Id: I8addba53de69be93730924a58107687020c19c74
Closes-Bug: #1533739
We provide a list of Watcher related projects
on the generated doc. This commit add links to
the Watcher dashboard project in various locations.
Change-Id: I1993cd5a11d3fcc8ca2c40b1779700359adab4ea
This documentation describes step-by-step the process for implementing
a new action in Watcher.
Change-Id: I978b81cdf9ac6dcf43eb3ecbb79ab64ae4fd6f72
Closes-Bug: #1534639